Showers · 16–24°C
| Bricklayer | 4 شخص | 8h |
| Labourer | 3 شخص | 7.5h |
Edge protection installed around the full perimeter of level 1 before work started.
Tower crane, breaker
Level 1 columns struck. Work area cleared and prepared.
لا توجد صور.
✓ تم ختم السجل
تم الختم في 7/8/2026، 6:05 م